Enabled filters :
Guide For the cable that connects SBIS stages together, please purchase separately HR10HR10P-RC-1 (with power cable) or HR10HR10-RC-1 (without power cable). Please purchase D9HR10-RC-2 separately for the cable that connects the host PC and SBIS. The interface is RS232C. For the power supply, please purchase the recommended AC adapter AC-ADP-2433 separately. Power can be supplied for up to 3 axes. After the 4th axis, an additional AC adapter is required for every 3 axes. A manual knob allows stage adjustment when the power is off. The following sample programs can be downloaded SG Sample or LabVIEW for 32/64-bit Windows
Name | Travel | Load Capacity | Mounting Thread | Delivery | Price | Add to cart | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
i
35mm Travel, X-Axis Stage, Built-In Controller, 120X120mm Platform, 1/4-20 Thread
SBIS26-35X-INCH |
35mm | 117N (12.0kg) | 1/4-20UNC |
6-12 weeks
|
£1,988.80
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
i
100mm Travel, X-Axis Stage, Built-In Controller, 120X120mm Platform, M6 Thread
SBIS26-100X-M6 |
100mm | 117N (12.0kg) | M6 |
3-5 days
|
£2,275.60
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
i
200mm Travel, X-Axis Stage, Built-In Controller, 120X120mm Platform, 1/4-20 Thread
SBIS26-200X-INCH |
200mm | 117N (12.0kg) | 1/4-20UNC |
6-12 weeks
|
£2,466.80
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
i
50mm Travel, X-Axis Stage, Built-In Controller, 120X120mm Platform, M6 Thread
SBIS26-50X-M6 |
50mm | 117N (12.0kg) | M6 |
3-5 days
|
£2,180.00
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
i
100mm Travel, X-Axis Stage, Built-In Controller, 120X120mm Platform, 1/4-20 Thread
SBIS26-100X-INCH |
100mm | 117N (12.0kg) | 1/4-20UNC |
3-5 days
|
£2,275.60
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
i
300mm Travel, X-Axis Stage, Built-In Controller, 120X120mm Platform, M6 Thread
SBIS26-300X-M6 |
300mm | 117N (12.0kg) | M6 |
6-12 weeks
|
£2,658.10
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
i
35mm Travel, X-Axis Stage, Built-In Controller, 120X120mm Platform, M6 Thread
SBIS26-35X-M6 |
35mm | 117N (12.0kg) | M6 |
3-5 days
|
£1,988.80
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
i
50mm Travel, X-Axis Stage, Built-In Controller, 120X120mm Platform, 1/4-20 Thread
SBIS26-50X-INCH |
50mm | 117N (12.0kg) | 1/4-20UNC |
6-12 weeks
|
£2,180.00
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
i
200mm Travel, X-Axis Stage, Built-In Controller, 120X120mm Platform, M6 Thread
SBIS26-200X-M6 |
200mm | 117N (12.0kg) | M6 |
6-12 weeks
|
£2,466.80
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
i
300mm Travel, X-Axis Stage, Built-In Controller, 120X120mm Platform, 1/4-20 Thread
SBIS26-300X-INCH |
300mm | 117N (12.0kg) | 1/4-20UNC |
6-12 weeks
|
£2,658.10
|
|
|
You must be logged in to ask questions